EasyManua.ls Logo

CPS ECB200KTL/US-800 - Page 20

Default Icon
135 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mechanical Installation
19 / 135
(2) Use two ropes to lift the device with the aid of aforementioned eyebolts
and the two lifting holes on the front mounting bracket, see figure 3-9 for
details.
Figure 3-9 Rope lifting with eyebolts and lifting holes
NOTICE:
The length of ropes shall make sure the angle between two sling
ropes is less than 60 degree, thus avoiding to damage or bend the
enclosure edges.
Consult the after-sale personnel for any special scenarios.
Hoist the bottom of the PCS with forklift
(1) Find the center of gravity of the PCS as shown below.
Figure 3-10 Center of gravity of the PCS