PRE-INSTALLATION CHECKLIST
✓ Check that the inverter environmental specifications (protection degree,
operating temperature range, humidity and altitude, etc.) meet the
requirements of the specific project location.
✓ Make sure that the electric utility grid voltage is within range for the grid
standard chosen.
✓ Ensure that the local electric utility grid authority has granted permission
to connect to the grid.
✓ Installation personnel must be qualified electricians or those who have
received professional training.
✓ Wear and use proper PPE (personal protective equipment) during
installation.
✓ Sufficient space according to Figure 3-3 and Figure 3-4 must be
provided to allow the inverter cooling system to operate effectively.
✓ Install the inverter away from flammable and/or combustible
substances.
✓ Avoid installing the inverter in locations that exceed the temperature
limits specified for the inverter to prevent undesirable power loss.