EasyManua.ls Logo

CPS SCA36KTL-DO/US-480 - Commissioning Steps

CPS SCA36KTL-DO/US-480
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
70
Chint Power System
Initialization
5.4 Commissioning Steps
Complete the list above before commissioning the inverter as follows:
1. Turn on the AC circuit breaker.
2. Turn “ON” the external DC switch(s)/circuit breaker(s). Skip these two
steps if there are no switches or circuit breakers.
3. Switch the Inverter’s DC Switch to the “ON” position. When the energy
supplied by the PV array is sufficient, the LCD screen of inverter will
light up. The inverter will then start up with the message “sys
checking”.
When the inverter completes “Initialization”, the LCD will show the screen
as Figure 5-1 below.
Figure 5-1 System Initialization Logo
4. Setting Language. Press ENT to access the main menu, select Setting
and press ENT. The password is “1111”, using the arrow keys enter the
password and press ENT to access the next submenu. Select System
Parameters, press ENT. Scroll to Setting Language, press ENT.
Then select the desired language and press ENT.

Table of Contents

Related product manuals