EasyManua.ls Logo

Cramaro CABRIOLE - Page 73

Default Icon
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CABRIOLE’
CRAMARO TS S.r.l. 37044 COLOGNA V.TA (VR) - VIA QUARI DESTRA, 71/G TEL. +39 0442/411688 / FAX + 39 0442/411690
E-MAIL info@cramaro.com WEBSITE: http://www.cramaro.com - Manual n° MCA016-EN-ED00 date 15/01/15
page 73
ROUTINE MAINTENANCE (PREVENTIVE)
SUBJECT OF THE ASSESSME
NT
FREQUENCY
EXPECTED OPERATION
ESTIMATED
TIME
SLIDING DEVICE, PLANARITY OF THE
UPPER CONTAINER PROFILES
DAILY
VISUAL INSPECTION OF THE
CONDITIONS AND WHETHER ANY
PARTS ARE MISSING
5 MINUTES
CHECK FOR ALL THE SAFETY DEVICES
ACTIVE ON THE TARPAULIN DAILY
VISUAL INSPECTION TO CHECK FOR
THE ANCHORING SIDE ROPES, HOOKS
AND SNAP-HOOKS AND THEIR STATE
OF WEAR
5 MINUTES
SAFETY DEVICES, ACTIVATION ROD
LOCKING, ETC.
DAILY
VISUAL INSPECTION TO CHECK FOR
ELEMENTS AND THEIR STATE OF WEAR
2 MINUTES
STATE OF THE FRONT PULLING PULLEY DAILY
VISUAL INTEGRITY CHECK
1 MINUTE
STATE OF THE REAR RETURN PULLEYS DAILY
VISUAL INTEGRITY CHECK
1 MINUTE
PULLING ROPE CLAMPS WEEKLY
CHECK AND TIGHTEN THE SCREWS
WITH A MANUAL SCREWDRIVER (NOT
ELECTRIC)
5 MINUTES
ELECTRICAL CONTACTS (for electric
versions)
WEEKLY
RESTORE THE CONTACTS, CLEANING
THEM AND PUTTING THEM AS CLOSE
AS NECESSARY
15 MINUTES
ELECTRICAL CABLES (for electric
versions)
WEEKLY
INSULATE WITH ELECTRICAL TAPE OR
REPLACE CABLES WITH DEFECTS OR
CUTS
15 MINUTES
INTEGRITY OF THE METAL PULLING
ROPES
WEEKLY
IMMEDIATELY REPLACE ROPES WITH
PROTRUDING THREADS
40 MINUTES
GENERAL NUTS AND BOLTS WEEKLY
CHECK THE TIGHTENING AND FOR THE
TIGHTENING BOLTS OF THE TARPAULIN
ELEMENTS
15
-
20
MINUTES
GENERAL CARPENTRY WEEKLY
CHECK THE STATE OF WEAR OF THE
SURFACES
INTEGRITY OF THE ELEMENTS
5 MINUTES
PULLING ROPES WEEKLY
DETAILED VISUAL CHECK OF THE
PULLING ROPES AND, IF NECESSARY,
CLEANING THE PINS BY SPRAYING
"SVITOL" TYPE ANTI-RUST SPRAY
15
-
2O
MINUTES
SLIDING RUNNERS WEEKLY
VISUAL INSPECTION TO CHECK FOR
ALL THE RUNNERS
2 MINUTES
TARPAULIN SHEET WEEKLY
DETAILED VISUAL CHECK OF THE
SHEET SURFACE AND ESPECIALLY OF
THE ANCHORING POINTS TO THE
CONTAINER
5 MINUTES
REMOTE CONTROL BATTERIES WEEKLY
REPLACE DISCHARGED BATTERIES
WITH NEW ONES
2 MINUTES
SWITCHES, ACTIVATION DEVICES,
CONTACT DEVICES,
EMERGENCY DEVICES
MONTHLY
CHECK THE INTEGRITY AND, IF
NECESSARY, REPLACE DAMAGED
COMPONENTS AT AN AUTHORISED
SERVICE CENTRE

Table of Contents