Test network
1. Tap TEST NETWORK.
Description
TEST NETWORK1
INSTALL2
NEXT3
2. When network test passes, tap INSTALL.
If network test fails, check the network connections and retry.
3. Tap NEXT.
TV configuration
The TV configuration only needs to be performed on the first unit installed. Configure the first unit
completely, save the configuration, then assemble and configure all other units.
1. Select Analog/Digital Cable and tap NEXT.
This will scan for all available channels. The scan can take 20 minutes to complete.
If scan was previously configured and stored, choose Download Configuration and tap NEXT to
configure other units. Go to Test Cybex GO Monitor.
Description
Analog/Digital Cable1
Download Configuration2
NEXT3
Page 30 of 202
Cybex 772A, 772AT Arc Trainer Part Number