EasyManua.ls Logo

Daikin FTXS20G2V1B - Removal of PCB

Daikin FTXS20G2V1B
316 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Unit - RK(X)S42G2V1B, ARXS42G2V1B SiENBE04-808_A
245 Removal Procedure
4.3 Removal of PCB
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1
Remove the screw and
remove the electrical
box cover.
Preparation
Remove the panels
according to the “Removal of
Outer Panels”.
Remove the electrical box
according to the “Removal of
Electrical Box”.
2
Detach the insulation
sheet.
The trimmed part goes front.
3
Remove the 2 screws
of the earth terminals.
(R12274)
Electrical box cover
(R8156)
(R8157)
Insulation
sheet
Earth
terminals
(R8158)
SiENBE04-808_A.pdf 257 21/02/2011 13:20:20

Table of Contents

Other manuals for Daikin FTXS20G2V1B

Related product manuals