EasyManua.ls Logo

Deger MLD Control - Page 15

Deger MLD Control
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
01/10/2021 ASSEMBLY INSTRUCTIONS MLD Control EC-6 with CCB III Page 15
ATTENTION!
The cable for the power supply connection must be routed underneath the power supply.
The primary wire may not be routed on the same side as the secondary wires. Primary and
secondary wires should never be routed together.
The cable of the anemometer can be extended up to 100 m.