01/10/2021 ASSEMBLY INSTRUCTIONS MLD Control EC-6 with CCB III Page 27
6.4 Places of installation
Rear view drawing.
Evaluation
unit wind
monitor
CCB
(Central
Control Box)
Grid connection
Junction box
may be attached
to the mast
Snow sensor
Drive
Azimut (AZ)
Drive
Elevation (EL)
Anemometer
(can be installed on DEGER
system using pendulum or can
be installed on building)
EC- 6
(Energy-
converter)
MLD sensor
East-West (AZ)
MLD sensor
Elevation (EL)
Building
Si
gn
al
ca
bl
es
Power
supply
for EC-6
Cable
can also
be used
for
inverter
when
designed
accordingl
y
Cables
can be
routed
through
the
mast