Figure 36. Connecting fan cable to PIB connector
Next steps
1 Installing the internal PERC riser
2 Ensure all the cables are routed correctly.
3 Installing the air shroud
4 Follow the procedure listed in After working inside your system.
Internal PERC riser
Removing the internal PERC riser
Prerequisites
1 Follow the safety guidelines listed in Safety instructions.
2 Follow the procedure listed in Before working inside your system.
3 Removing the air shroud
Steps
1 Open the cable guiding latch for easy access.
2 Lower the plunger.
3 Press the cable connector and disconnect the PERC cable from the backplane.
4 Hold the blue touch points and lift the internal PERC riser out of the system.
84
Installing and removing system components