EasyManua.ls Logo

Dell EMC PowerStore 500T - Closing the Cable Management Arms

Dell EMC PowerStore 500T
131 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 30. Cabling three expansion enclosures
Closing the cable management arms
About this task
Perform this procedure to close the cable management arms.
Steps
1. Close the lower cable management arm:
a. Swing the lower cable management arm to the left side of the enclosure, and align the retention latch with the lower rail
bracket.
b. Press the retention latch onto the lower rail bracket.
c. Make sure that you hear the audible click that indicates that the lower cable management arm is in place.
2. Close the upper cable management arm:
a. Swing the upper cable management arm to the right side of the enclosure, and align the retention latch with the upper
rail bracket.
b. Press the retention latch onto the upper rail bracket.
c. Make sure that you hear the audible click that indicates that the upper cable management arm is in place.
Example
Figure 31. Closing the cable management arms
34
Install a new base enclosure and optional expansion enclosure

Table of Contents

Related product manuals