EasyManua.ls Logo

Delta C2000 Series - Page 193

Delta C2000 Series
936 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 7 Optional AccessoriesC2000
7-86
Assembly for Frame H2 (Straight Stand)
1. Loosen the 3 screws and remove the cover of conduit box.
2. Remove the 4 covers of conduit box, and fasten the loosen screws back to the original location.
Screw Torque: 100~110 kg-cm / [86.7~95.4 Ib-in] / [9.8~10.8 Nm]
3. Remove the parts and screws as below figure shown.

Table of Contents

Other manuals for Delta C2000 Series

Related product manuals