Saw - 104 RT45 Operator’s Manual
Finish Job
4. Move attachment speed/direction control to desired speed. SAW WILL TURN.
5. Slowly lower saw to trench depth.
6. Release parking brake.
7. Increase engine speed to full throttle.
8. Move ground drive hand control to desired trenching speed.
Finish Job
1. When trench is complete, adjust throttle to low.
2. Raise saw.
3. As saw clears top of trench, move attachment speed/direction control to neutral.
4. If equipped with traversing saw, return to center position.
5. Drive a short distance away from work site.
6. Shut down tractor. See page 75 for correct shutdown procedures.
7. Wash bits and mounting blocks with high pressure water before parking unit overnight.
Moving digging teeth will kill you or cut off arm or
leg. Stay away.
To help avoid injury:
• Allow 3’ (1 m) between digging teeth and obstacle. Machine might jerk when digging starts.
• Keep everyone at least 10’ (3 m) from machine, attachments, and their range of movement.
NOTICE:
• Lower saw into softer material then move into harder or abrasive material. For example,
lower saw into dirt at shoulder before cutting across road.
• If a curved trench must be cut, make a series of straight cuts.
IMPORTANT: If a curved trench must be cut, make a series of straight cuts.