RT45 Operator’s Manual Operation Overview - 63
Sawing
Sawing
1. Start unit. See page 72.
2. Position tractor and controls. See page 102.
3. Begin sawing. See page 103.
4. Complete the installation. See page 104.
5. Backfill the trench. See page 140.
6. Shut down tractor. See page 75.
Plowing
1. Start unit. See page 72.
2. Position tractor and controls. See page 107.
3. Attach product. See page 107.
4. Begin plowing. See page 109.
5. Complete the installation. See page 110.
6. Shut down tractor. See page 75.
Drilling
1. Start unit. See page 72.
2. Dig approach trench and target trench. See page 112.
3. Assemble drill string and position tractor. See page 112.
4. Begin drilling. See page 115.
5. Use drill string guide as needed. See page 116.
6. Add rod. See page 117.
7. Backream. See page 118.
8. Shut down tractor. See page 75.
9. Disassemble joints. See page 122.