EasyManua.ls Logo

Doosan G424FE - Page 46

Doosan G424FE
306 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G424F(FE) Service Manual Chapter 3. Engine Mechanical System 44
14. Connect wiring to the injectors.
15. Connect the PCV hose between PCV and fitting.
16. Hose clamp with torque driver; tighten.
Tighten
Clamps: 1. 1.5 N·m (0.75 – 1.1 lb·ft.).
17. Bracket-stay and its attaching nuts, without
tightening.
18. With a 17-mm torque spanner; tighten.
Tighten
• Nuts: 35– 40 N·m (25.8 – 29.5 lb·ft.).
19. A new gasket between mixer assembly and
intake manifold.
20. Mixer assembly and its attaching nuts, without
tightening.
21. With a 5mm hex-bit socket wrench and torque
wrench; tighten by using thread locker.

Table of Contents

Related product manuals