EasyManua.ls Logo

Dover OPW SiteSentinel iSite - Finishing the Flex Probe Installation

Dover OPW SiteSentinel iSite
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 39 of 145
www.opwglobal.com
4.5.6 Finishing the Flex Probe Installation
25. Connect the probe wiring bushing ½-inch NPT to the
junction box using a short length [18 inches (45.7 cm) max]
of flex conduit.
26. Connect the probe to the cable in the junction box and
console as below.
27. Verify that the probe is operating correctly at the console.
28. Waterproof the probe connections at the junction box with
the epoxy seal-pack and close the junction box.
Figure 4-7 Finishing the Flex Probe Installation
Figure 4-8 Flex Probe Component Diagram

Table of Contents

Related product manuals