13.1
Prior to Installation
Check the following:
1. Enclosure Mounting:
Knockouts and mounting means are provided for all cabinetry
.
Do not drill holes in any of the enclosures.
Doing so would violate the safety listing of the system.
2.
Grounding
:
For applications where wire conduits are used, follow the applicable
local codes and requirements.
An ACR/RIM system incorporates internal noise suppression
circuitry. In order to ensure proper operation of the equipment
and provide the necessary safety must be grounded. A ground
wire - if applicable, per local code - must be connected
between the ACR/RIM ground terminal and the main electrical
service panel.
In applications using conduit, the conduit should not be used as ground!
3. Circuit Breakers:
Power to the ACR/RIM must be supplied from dedicated
circuit breakers.
No other equipment should be powered from these breakers
including the pumps that are monitored (passively) or
controlled (actively).
13.2
Installation Procedure
All dispensers and controller are installed according to manufacturer’s
specifications and should be tested for proper operation.
1. OPW Tank Gauge is installed to specifications
2. Mount ACR/RIM
3. Connect ACR/RIM to specific dispenser box
4. Test ACR/RIM
5. Connect ACR/RIM
6. Conduit Requirements: (if applicable, per local code)
ACR/RIM Power Conduit
Where applicable, this conduit, following all local codes,
should run from the main circuit panel to the ACR/RIM.
This conduit should only contain the Terminal Feed,
Neutrals and Ground wires.
ACR/RIM Pump Loop Listener
This conduit should run from the ACR/RIM to the location
of the Pump D-Box.