5. Locate Wayne Distribution box and wire from CN9 connector
to an unused pump position in the D-Box.
Set Jumpers on RIM interface for Wayne
Locate Wayne/Dresser distribution box and wire the other
end into an unused pump position in the D-Box.
In the event that the D-Box board is full, wire in “series” with an
existing pump.
ACR/RIM can only support 1-loop Wayne pump installations.
In the event that the D-BOX is full, wire in “series” with one existing
pump.
6. Gilbarco (to be supplied when Gilbarco ACR/RIM has been
completed)
7. Attach cable 20-1586 to connector CN2 as below:
1
Green/White
2
Green
3
Brown
Then run cable from RIM interface to the RS-232 configure
for ACR/RIM on the SiteSentinel® iSite™ controller (Figure
13-6).
Figure 13-5 Locate Wayne D-Box
Figure 13-6 Connect to Controller