DH200F User Manual
©Dyness reserves the copyright of this document.
38
correct order.
4.Use wire strippers to strip the protective layer of the cable to expose
the copper core.
5.Crimp the cable using the OT terminals, refer to "Preparing the
Cable" in this chapter.
6.Use M8 bolt to fasten OT terminal to the wiring hole with a
tightening torque of 13N.m. 7.
7.After the wiring is completed, gently tug the cable to make sure
there is a margin.
PV Wiring
(Optional)
1.Turn the PV DC circuit breaker MPPT to OFF and measure with a
multimeter to ensure there is no voltage at the terminals.
2.Bring the cable into the inlet hole and into the PV DC wiring area of
the electrical cabinet.
3.Make sure the DC cables are connected to the P+ and P- terminals in
the correct order.
4. Use wire strippers to strip the protective layer of the cable to
expose the copper core portion.
5.Crimp the cable using the OT terminal, refer to "Preparing the Cable"
in this chapter.
6. Use M8 bolt to fasten the OT terminal to the wiring hole with a
tightening torque of 13N.m. 7.
7.After the wiring is completed, gently tug the cable to make sure
there is a margin.
Be sure to strictly follow the terminal phase sequence wiring. After all electrical
connections are completed, the wiring should be thoroughly and carefully checked. At
the same time, the following operations are also required:
WARNING
Use fireproof and waterproof materials to tightly seal the outdoor cabinet inlet and
outlet holes and the gaps around them.
Lock the cabinet door and box door: follow the opposite steps of the "Open the cabinet
door before connecting the cables" method, lock the cabinet door and pull out the key.
Make sure that the sealing strip around the door is not curled after the door is closed!