153 Eaton® 9390 (100–160 kVA) UPS Installation and Operation Manual 164201604—Rev F
FFiigguurree 8833.. 116644220011660044--55 PPoowweerr WWiirriinngg IInnssttaallllaattiioonn NNootteess ((CCoonnttiinnuueedd))
POWER WIRING INSTALLATION NOTES
011509 D
164201604-52 of 15
DESCRIPTION:
DATE:
: T E E H S : O N G N I W A R D
REVISION:
Table F. INPUT/OUTPUT Ratings & External Wiring Requirements for the Eaton 9390-120/120 and
9390-160/120
Units Rating 50/60 Hz
Basic Unit Rating at 0.9 lagging pF
load
kVA
kW
120
108
120
108
120
108
120
108
120
108
Input and Bypass Input
Output
VOLTS
VOLTS
208/220
208/220
380
380
400
400
415
415
480
480
AC Input to UPS Rectifier
(0.98 min. pF)
Full Load Current plus Battery
Recharge Current
(3) Phases, (1) Ground
A
Amps 360 205 195 190 160
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
4/0
(2)
1/0
(2)
1/0
(2)
1/0
(2)
4/0
(1)
AC Input to UPS Bypass
Full Load Current
(3) Phases, (1) Neutral-if required,
(1) Ground
B
Amps 333/315 182 173 167 144
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
4/0
(2)
1/0
(1)
1/0
(1)
1/0
(1)
4/0
(1)
DC Input from Battery to UPS
(1) Positive, (1) Negative
C
Vdc
Amps@
(2.0V/cell)
384-480
302
432-480
302
432-480
302
432-480
302
432-480
302
Minimum Conductor Size
Number per Pole
AWG or kcmil
(each)
3/0
(2)
3/0
(2)
3/0
(2)
3/0
(2)
3/0
(2)
AC Output to Critical Load
Full Load Current
(3) Phases, (1) Neutral-if required,
(1) Ground
D
Amps 333/315 182 173 167 144
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
4/0
(2)
1/0
(2)
1/0
(2)
1/0
(2)
4/0
(1)
Neutral Bonding Jumper
Minimu m Conducto r Size
Number (See Note 7)
-
AWG or kcmil
(each)
1/0
(1)
2
(2)
2
(2)
2
(2)
2
(1)
5.If installing, as part of the UPS system, a maintenance bypass without a rectifier input
breaker, a minimum of two separate feeds with upstream feeder breakers, or one feed with
two upstream feeder breakers, must be provided: one for the UPS and one for the
maintenance bypass input. DO NOT use one feed or a singlefeeder breaker to supply
both the UPS and the maintenance bypass.
6.The bypass feed into this equipment uses three or four wires. The rectifier feed into this
equipment uses three wires. The phases must be symmetrical about ground (from a Wye
source) for proper equipment operation.
NOTE: Callout letters A, B, C, and D map to Figure 79
sheets 1, 2, 4, 5, and 6.
Installation Information