Eaton® 9390 (100–160 kVA) UPS Installation and Operation Manual 164201604—Rev F 166
FFiigguurree 8833.. 116644220011660044--55 PPoowweerr WWiirriinngg IInnssttaallllaattiioonn NNootteess ((CCoonnttiinnuueedd))
POWER WIRING INSTALLATION NOTES
091505 A
164201604-5
DESCRIPTION:
DATE:
: T E E H S : O N G N I W A R D
REVISION:
UPM 2
Battery
Bypass inputs to UPMs
UPM 1
Battery
UPM 3
Battery
UPM 4
Battery
Outputs from UPMs
1A (30)
2A (35)
3A (40)
4A (45)
1B (25)
2B (20)
3B (15)
4B (10)
15 of 15
NOTE:Wire lengths in the diagram and
formula are in feet and are for
example only.
Distributed Bypass
Wiring Requirements
33.Required parallel system wiring length must be in accordance with the following formula,
as referenced to the diagram below, to ensure approximately equal current sharing when
in Static Bypass mode:
(Total length of 1A + 1B)
(Total length of 2A + 2B)
(Total length of 3A + 3B)(Total length of 4A + 4B)
(30 + 25)(35 + 20)(40 + 15)(45 + 10)
This rule has a tolerance of approximately±10% for the combined input and output wire
lengths.
If installing only two UPMs in a fully redundant system, this requirement is no longer
required, as each UPM is capable of supporting the full bypass requirement. However, this
would preclude future expansion.