4. Install wiring from the Hot Sync CAN Bridge Card in accordance with the instructions listed below:
• 6.2 Installing Parallel System Control Wiring
• 6.3 Installing a Remote Monitor Panel (RMP)
• 6.4 Installing a Remote Interface Module (RIM)
• 6.5 Installing a Supervisory Contact Module (SCM)
66..22 IInnssttaalllliinngg PPaarraalllleell SSyysstteemm CCoonnttrrooll WWiirriinngg
NNOOTTEE 11 When installing external wiring to the X-Slot CAN Bridge Card card, conduit must be
installed to the UPS cabinet. When installing internal wiring to the X-Slot CAN Bridge
Card card terminals, route the wiring through the internal opening in the X-Slot
communication bay.
NNOOTTEE 22 When installing interface wiring for the parallel system pull chain, conduit must be
installed between UPMs.
To install parallel system control wiring:
1. Verify the UPS system is turned off and all power sources are removed. See
Chapter 9 UPS Operating Instructions for shutdown instructions.
2. Perform the procedure listed in 6.1 Installing an Eaton Hot Sync CAN Bridge Card.
3. If not already removed, remove the doors. Remove the retaining screws located inside each door at the
top and bottom hinge pivot points, then lift the door off. Retain the hardware for later use.
4. Remove the screws securing the control panel door and swing the door open. Retain the hardware for
later use.
5. Remove the screws securing the top internal safety shield panel. Remove the panel to gain access to the
TB1 and TB2 terminal blocks, X-Slot communication bays, and the top conduit landing plate (see
Figure 86). Retain the hardware for later use.
6. If installing interface wiring from the bottom of the cabinet, proceed to Step 7; otherwise, proceed to
Step 8.
7. Remove the screws securing the bottom internal safety shield panel and remove the panel to gain access
to the bottom conduit landing plate.
8. Remove the X-Slot conduit landing plate from the UPS cabinet to drill or punch conduit holes (see
Figure 84).
9. Reinstall the conduit landing plate and install the conduit.
10. Install CAN wiring between UPMs. See Figure 86 for Eaton Hot Sync CAN Bridge Card location, terminal
location, and wiring information.
11. Install parallel system backup control (pull chain) wiring between UPMs. See Figure 86 for terminal
locations and wiring information.
12. Install parallel system backup control (pull chain) wiring between the bypass relay and building alarm 2. See
Figure 86 for terminal locations and wiring information.
NNOOTTEE Setup of the Eaton Hot Sync CAN Bridge Card for parallel operation must be performed
by an authorized Eaton Customer Service Engineer. Contact service to schedule a date.
13. When all wiring is complete, reinstall the safety shield panels removed in previous steps. Secure with the
retained hardware.
14. Close the control panel door and secure with the retained hardware.