EasyManua.ls Logo

Eaton 9A UPS - Product Safety and Handling

Eaton 9A UPS
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Do not lay tools or metal parts on top of baeries.
Disconnect charging source prior to connecng or disconnecng baery terminals.
Determine if baery is inadvertently grounded. If inadvertently grounded, remove
source from ground. Contact with any part of a grounded baery can result in electri-
cal shock. The likelihood of such shock can be reduced if such grounds are removed
during installaon and maintenance (applicable to equipment and remote baery
supplies not having a grounded supply circuit).
Product safety
The UPS connecon instrucons and operaon described in the manual must be fol-
lowed in the indicated order.
CAUTION- To reduce the risk of re, the unit connects only to a circuit provided with 20
or 30 amperes maximum branch circuit overcurrent protecon in accordance with the
Naonal Electric Code, ANSI/NFPA 70 (US installaons only).
Check that the indicaons on the rang plate correspond to your AC powered system and
to the actual electrical consumpon of all the equipment to be connected to the system.
For PLUGGABLE EQUIPMENT, the socket-outlet shall be installed near the equipment and
shall be easily accessible.
Never install the system near liquids or in an excessively damp environment.
Never let a foreign body penetrate inside the system.
Never block the venlaon grates of the system.
Never expose the system to direct sunlight or source of heat.
If the system must be stored prior to installaon, storage must be in a dry place.
The admissible storage temperature range is -15°C to +55°C without baeries, 0°C to
+40°C with baeries.
The system is not for use in a computer room AS DEFINED IN the standard for the Protec-
on of Informaon Technology Equipment, ANSI/NFPA 75 (US installaons only).
Special precauons
The unit is heavy: wear safety shoes and use vacuum lier preferenally for handling
operaons.
All handling operaons will require at least two people (unpacking, liing, installaon in
rack system).
Before and aer the installaon, if the UPS remains de-energized for a long period, the
UPS must be energized for a period of 24 hours, at least once every 6 months (for a nor-
mal storage temperature less than 25°C). This charges the baery, thus avoiding possible
irreversible damage.
During the replacement of the Baery Module, it is imperave to use the same type and
number of elements as the original Baery Module provided with the UPS to maintain
an idencal level of performance and safety. If there are any quesons, don’t hesitate to

Related product manuals