EasyManua.ls Logo

Eaton Power Xpert 9395P - Page 74

Eaton Power Xpert 9395P
239 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14 53
7. Using a forklift with the forks in the front forklift slots, position the ISBM section adjacent to the left side of
the previously installed UPM section. Verify that the ISBM section right side is against the UPM section
left side and the front of the cabinet bases are flush with each other (see Figure 21).
8. Reinstall the corner channel (see Figure 20) and secure using the retained hardware.
9. Reinstall the left middle panel (see Figure 20) and secure using the retained hardware.
Figure 21. ISBM and UPM Sections Joined
UPM Wireway
(Power wiring harnesses are coiled in this area.)
10. Reinstall the left top panel (see Figure 20) and secure using the retained hardware.
NOTE Three flat cabinet joining brackets are provided in the hardware kit for securing the ISBM
and UPM sections at the top front, top rear, and front base (see Steps 11 and 12).
11. Locate the hardware kit (packed inside a drawstring bag tied to the left middle panel of the UPM section).
Locate two flat brackets and screws from the hardware kit. Align the holes in the flat brackets over holes in
the top rear and top front of the ISBM and UPM sections. Secure the brackets with the screws from the
hardware kit (see Figure 22).
12. Locate one flat bracket and screws from the hardware kit. Align the holes in the flat bracket over holes in
the front base of the ISBM and UPM sections. Secure the bracket with the screws from the hardware kit
(see Figure 22).
13. Proceed to paragraph 4.4 Electrically Connecting the Sections.
UPS System Installation

Table of Contents

Other manuals for Eaton Power Xpert 9395P

Related product manuals