EasyManua.ls Logo

Eaton Powerware 9125 - Page 10

Eaton Powerware 9125
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
6
Each rail kit requires one (1) of each item in the following list:
S Left rail assembly (located in the UPS and EBM cartons)
S Right rail assembly (located in the UPS and EBM cartons)
S Rack mounting bracket kit (located in the UPS and EBM cartons)
S Rail hardware kit (located in the E30 UPS and EBM accessory kits)
To install the rail kit(s):
1. Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 4).
Assembly Wing Nuts
Front
Rear
Rear Hold-Down Bracket
Figure 4. Adjusting the Rail Depth
2. Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
3. Secure the rail to the front of the rack with two pan-head screws
and one adapter plate. Insert the screws through positions 3 and 4
oftherail(seeFigure5).
NOTE Do not tighten the screws until the UPS or EBM is installed.

Other manuals for Eaton Powerware 9125

Related product manuals