INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
7
Assembly Wing Nuts
Front Rail Pan-Head
Screws
Adapter
Plate
Position 4
Position 3
Figure 5. Securing the Front of the Rail
4. Using two clip nuts and two hex-head screws, attach the rail to the
rear of the rack (see Figure 6 and Figure 7).
The bottom rail uses positions 2 and 4 for the rear hex-head
screws. If you are installing additional rails, place the next rail
4 holes above the last installed screw.