EasyManua.ls Logo

Eaton Powerware 9125 - Page 11

Eaton Powerware 9125
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
7
Assembly Wing Nuts
Front Rail Pan-Head
Screws
Adapter
Plate
Position 4
Position 3
Figure 5. Securing the Front of the Rail
4. Using two clip nuts and two hex-head screws, attach the rail to the
rear of the rack (see Figure 6 and Figure 7).
The bottom rail uses positions 2 and 4 for the rear hex-head
screws. If you are installing additional rails, place the next rail
4 holes above the last installed screw.

Other manuals for Eaton Powerware 9125

Related product manuals