INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
8
Position 2
Position 4
Position 8
Position 10
First Rail
Second Rail
Figure 6. Rear Rail Screw Positions
Figure 7. Securing the Rear of the Rail
5. Repeat Steps 3 and 4 for the other rail.
6. Tighten the assembly wing nuts on both rail assemblies.
7. Place the UPS on a flat, stable surface with the front of the UPS
facing toward you.