INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
9
8. Attach the supplied mounting handles to the mounting brackets and
secure with the supplied #8-32
×1/2” flat-head screws (see
Figure 8).
9. Align the mounting brackets with the screw holes on the side of the
UPS and secure with the supplied M4
× 8 flat-head screws (see
Figure 8).
10. If installing optional cabinets, repeat Steps 7 through 9 for each
cabinet.
Mounting Handle
Mounting Bracket
#8-32×1/2”
flat-head screws
M4×8 flat-head screws
Figure 8. Installing t he Mounting Handles and Brackets
CAUTION
The UPS (37 kg/81.5 lb), EBM (42.5 kg/93 lb), and PDM (34.5 kg/76 lb) are heavy. A minimum of
two people are required to lift the cabinets into the rack.
NOTE The PDM must be installed above the UPS. The EBMs must be installed below the
UPS as shown in Figure 9.
UPS
PDM
EBM
Figure 9. Rack-Mount UPS with PDM and EBM