EasyManua.ls Logo

Eaton SC300 - Page 150

Eaton SC300
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SC300 Handbook
144
Copyright © 2007-2018 Eaton Corporation. All Rights Reserved.
IPN 997-00012-03 B2 Issue B2 July 2018
Event Type Description Additional Event
Information
Manual Equalize Start An Equalize cycle has been
manually started.
Manual Equalize Stop An Equalize cycle has been
manually stopped.
Manual Fast Charge
Stop
A Fast Charge cycle has been
manually stopped.
Rectifier Restart A rectifier was started manually.
This excludes events where a
rectifier starts due to Load-Based
Rectifier Shutdown or after the
removal of a fault condition.
Rectifier Shutdown A rectifier was shut down
manually. This excludes events
where a rectifier shuts down due
to Load-Based Rectifier Shutdown
or a fault condition.
Battery State Reset The battery state has been reset,
setting the value of Ah Discharged
back to zero.
Start Up Records when the controller
started running.
Smart Alarm Activation A smart alarm has become active. Smart Alarm name
Smart Alarm
Deactivation
A smart alarm has become
inactive.
Smart Alarm name
Generator Start The generator has been started.
Generator Stop The generator has been stopped.
Peak Load Reduction
Start
The PLR process has been started.
Peak Load Reduction
Stop
The PLR process has been
stopped.
Reset System The SC300 has been reset.
Control Process Start An SC300 control process has
started.
Control Process Stop An SC300 control process has
stopped.

Table of Contents

Related product manuals