Check the following items on receipt of the pump package.
1) Check that the nameplate affixed to the outer cover of the pump to confirm that the pump
supplied agrees with your order. Check the accessories against the packing list and the
previously submitted drawings and documents to confirm that the all ordered accessories have
arrived.
2) Check whether damage has occurred or screws/bolts have worked themselves loose in transit.
3) Store the pump in a dry and clean place until installation.
Temperature : 5 to 40 deg C
Humidity : 80% or less (condensation must not exist)
4) The pump must be placed in an upright position.
NOTE
Do not stack the pump. The pump must be placed in an upright position. When the
pump is overturned, lubricating oil inside a pump may leak to a rotor room, and it may
cause trouble to operation.
CAUTION
Notify EBARA immediately, when damage is discovered or when components are
missing. Do not use when a leak is present as this will result in accident.