7. Installation and initial controls
7.1. Components Control
After unpacking the unit, check that it is intact and not damaged in anyway. Otherwise, immediately
contact SNDC.
Make sure that the following items are present:
- Instruction manual
- Plasticized memo sheet
- Power cable
- Blue LP hose and R134a valve
- Red HP hose and R134a valve
- HP adapter for connection to an external refrigerant tank
Take the unit off its packing platform using the back handle and front lift bar. Do not lift it alone!
Handle with care, avoiding any shock.
Never lift the unit by its front handles!
7.2. Transport and handling
Make sure vehicle is adapted to well adapted to transport the unit.
Although the heaviest components have been placed in the lower part of the unit, to lower the
centre of gravity, the risk of tipping still exists.
The unit is on 4 wheels.
To move it push by hand.
Keep the unit up right.