62
SUMMARY – SHEET 1
TCD Laundry
08/31 10:36:45
ES 08
WASHER #1 450 POUNDS
SHIFT TIMES 1ST 04:30 - 12:00
2ND 12:00 - 20:00
3RD 20:00 - 22:00
OPERATING ZONE 04:30 - 22:00
REPORT DATE FROM: 08/25
TO: 08/31
PRODUCTION SUMMARY REPORT
TOTAL LOADS AND PRODUCT COST
1st SHIFT 2nd SHIFT 3rd SHIFT TOTAL
TOTAL LOADS 106 588.18 99 82.60 0 0.00 205 670.78
FORMULAS LOADS / COST LOADS / COST LOADS/COST LOADS/COST
1 BAR MOPS
2 SHIRTS
3 PANTS
4 COTTON
5 WHT INDUSTRIAL
6 MATS
1 17.05
17 178.09
38 266.76
2 25.38
7 80.89
41 20.50
2 34.10
0 0.00
0 0.00
0 0.00
0 0.00
97 48.50
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
1 17.05
17 49.47
38 59.28
2 5.64
7 22.47
41 4.10
1st SHIFT 2nd SHIFT 3rd SHIFT TOTAL
PRODUCT USAGE (US GALLONS)
PUMP# PRODUCT AMOUNT / COST AMOUNT / COST AMOUNT / COST AMOUNT / COST
1
2
3
4
5
6
7
8
18.19 318.15
29.27 124.40
18.66 65.31
8.32 7.32
2.50 18.12
8.38 54.88
0.0 0.00
0.0 0.00
2.44 42.72
6.50 27.62
2.25 7.88
0 0.00
0 0.00
0.67 4.38
0.0 0.00
0.0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
1 17.05
17 49.47
38 59.28
2 5.64
7 22.47
41 4.10
REV
SPEED
CHARGE
BLEACH
TEX
LIZER
PUMP 7
PUMP8
588.18 82.60 0.00 670.78
A
B
C
D E F G
TOTAL LOADS AND PRODUCTION COST
A. FORMULA NAMES AND NUMBERS – Describes formula name and number
B. SHIFTS - COST PER LOAD – Describes cost per load for each shift
C. SHIFTS – COST PER LOAD TOTALS – Describes cost per load for combined shifts
PRODUCT USAGE
D. PUMP NUMBER – Indicates pump number
E. PRODUCT NAME – Indicates product name
F. AMOUNT / COST – Reports amount of product consumed and corresponding cost per shift
G. AMOUNT / COST TOTALS – Reports the amount and cost of combined shifts