63
SUMMARY – SHEET 2
TCD Laundry
08/31 10:36:45
ES 08
WASHER #1 450 POUNDS
SHIFT TIMES 1ST 04:30 - 12:00
2ND 12:00 - 20:00
3RD 20:00 - 22:00
OPERATING ZONE 04:30 - 22:00
REPORT DATE FROM: 08/25
TO: 08/31
PRODUCTION SUMMARY REPORT
1st SHIFT 2nd SHIFT 3rd SHIFT TOTAL AVERAGE
FORMULAS COST / CWT COST / CWT COST / CWT COST / CWT
1 BAR MOPS
2 SHIRTS
3 PANTS
4 COTTON
5 WHT INDUSTRIAL
6 MATS
3.41
2.91
1.56
2.82
3.21
0.10
3.41
0.00
0.00
0.00
0.00
0.10
0.00
0.00
0.00
0.00
0.00
0.00
3.41
2.91
1.56
2.82
3.21
0.10
AVERAGE TIME BETWEEN LOADS
1st SHIFT 2nd SHIFT 3rd SHIFT TOTAL AVERAGE
17.2 18.5 0.0 17.9
WATER USAGE TOTALS
1st SHIFT 2nd SHIFT 3rd SHIFT TOTAL AVERAGE
WASHER ON TIME 52:57 36:18 0:00 88:75
HOT WATER USAGE 0 0 0 0
COLD WATER USAGE 0 0 0 0
STEAM USAGE 0 0 0 0
A B
C
D E
COST PER CWT
A. FORMULA NAME AND NUMBER - Indicates the formula name
B. COST PER CWT BY SHIFT – Reports the cost per CWT by shift
C. COST PER CWT TOTALS – Reports the cost per CWT for all shifts
D. AVERAGE TIME BETWEEN LOADS – Reports turnaround time
E. WATER USAGE TOTALS – Not functional in current version