Installation Serinus 51 User manual 1.0
10
2
Installation
2.1 Initial check
Packaging
The packaging which the Serinus 51 is transported in is specifically designed to
minimise the effects of shock and vibration during transportation. Ecotech
recommends that the packaging be kept if there is a likelihood that the instrument is
going to be relocated. For this purpose, it is also good to keep the red plastic caps
installed in the pneumatic connections.
In the event that the packaging is to be disposed of, all the materials used are
recyclable and should be disposed of accordingly.
Check the instrument with the following steps:
• Open instrument lid by using a screwdriver to undo the front quarter turn
fasteners, also undo any further screws that may be installed in either the front
or rear panel, then either slide the lid backwards (bench top)
• Check that all pneumatic and electrical connectors are connected, if not
reconnect
• Check for any visible and obvious damage
(if damage exists contact you supplier and follow the instructions in Claims
for Damaged Shipments and Shipping Discrepancies page iv)
Figure 4 Opening the lid
Items Received
With the delivery of the Serinus 51, you should have received the following:
• Ecotech Serinus 51 instrument PN: E020050
• Software CD PN: S040001
• End Caps PN: B010002-02
• Manual PN: M010029
• Power Cord (120V)* PN: 060-070110
• Power Cord (240V)* Australia PN: 060-070140
Europe PN: 060-070120
UK PN: 060-070160
*Power cord received depends on the power supply of the country (120V or 240V.).
Please check that all these items have been delivered undamaged.
If there is any item damaged or if you are unsure, please contact
your supplier BEFORE turning on the instrument.