EasyManua.ls Logo

Ecotech Serinus 51 - 3 Operation; 3.1 Warmup; 3.2 General operational information

Ecotech Serinus 51
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Serinus 51 User manual 1.0
Operation
15
3
Operation
3.1 Warmup
As the instrument is turned on it will adjust and calibrate itself ready for monitoring.
No measurements are taken during the warm-up.
When the main screen appears, the instrument will display the following actions being
taken (bottom of the screen):
High voltage check:
Instrument setting upper voltage limit for measurement
Lamp Stabilize
Adjusts the lamps current (27mA) for a stable (reference voltage) signal/output (10-15
minutes).
Ref stabilize
Adjusts the detector to set its maximum voltage output and create a stable output
signal.
After this warm-up has completed the instrument will immediately begin taking
measurements as seen in section 3.4.
3.2 General operational information
The Serinus is operated with the use of 3 sets of buttons. There are the selection
buttons, scrolling buttons and keypad.
Figure 7 Serinus front panel
(1) Selection buttons
The selection buttons will perform the function specified directly above it on
the screen i.e. quick menu, main menu, open, back, select, start etc

Table of Contents

Related product manuals