EasyManua.ls Logo

EDMI ES-10B - 17 Servicing; Figure 16-1: ES-10 B with Communications Hub

EDMI ES-10B
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ES-10B 4 Terminal Single Phase Residential Electricity
Meter - Product Guide
Copyright © 2019 EDMI Europe Ltd. All rights reserved
Version / Status: 1.1
Public
PAGE 57 OF 62
Figure 16-1: ES-10B with Communications Hub
The Communications Hub is securely mounted via the top sealing screw. Care should be taken to
align the Communications Hub rails to that of the meter, so the Communications Hub header can
mate properly with the meter connector. Both the screw meter mount and the connection interface
is common and specified in ICHIS. However, the size and shape of the Communications Hub, and
presence and position of any LEDs will vary depending upon its manufacturer. Refer to the
appropriate Communications Hub documentation.
17 Servicing
The meter is not designed for field servicing and has no user serviceable parts. The meter has no
internal fuses. In the event of failure of the meter, contact EDMI or follow your approved
diagnostics and triage process.
Communications Hub
Top Sealing Screw

Table of Contents

Related product manuals