STP-301/451 Series Instruction Manual
12
FIGURES
Figure 2.1 Cross Sectional View of the STP Pump .................................................................2-2
Figure 4.1 Configuration of the STP Pump..............................................................................4-2
Figure 4.2 Installation of the STP Pump to the Vacuum Equipment........................................4-5
Figure 4.3 STP Pump Installation Positions ............................................................................4-7
Figure 4.4 Positions of the Outlet Port on the Horizontally or Slanted Installed STP Pump ....4-7
Figure 4.5 Example of securing the STP Pump
(When securing the inlet port with bolts) ................................................................4-9
Figure 4.6 Example of securing the STP Pump
(When securing the inlet port flange with claw clamps)........................................4-10
Figure 4.7 Example of securing the STP Pump
(When installing the damper in the inlet port flange) ............................................4-11
Figure 4.8 Connecting the Purge Port ...................................................................................4-14
Figure 5.1 Attaching Positions of the Cooling Unit and Baking Heater....................................5-5
Figure 6.1 STP Control Unit Front Panel.................................................................................6-2
Figure 6.2 STP Control Unit Rear Panel .................................................................................6-4
Figure 6.3 STP Control Unit Top Panel ...................................................................................6-5
Figure 6.4 STP Control Unit Side Panel (Left).........................................................................6-6
Figure 6.5 Peripheral Spaces of the STP Control Unit ............................................................6-8
Figure 6.6 Example of Securing the STP Control Unit ............................................................6-9
Figure 6.7 External Dimensions of Ground Cable .................................................................6-10
Figure 6.8 External Dimensions of STP Connection Cable ...................................................6-10
Figure 6.9 External Dimensions of STP Connection Cable ...................................................6-11
Figure 6.10 Connecting Method of the AC Power Cable.........................................................6-13
Figure 6.11 How to Secure the Power Cable ..........................................................................6-14
Figure 7.1 STP Pump Operation Procedures..........................................................................7-9
Figure 8.1 I/O TB1 Remote Output Signal Terminal Block ......................................................8-3
Figure 8.2 I/O TB2 Remote Input Signal Terminal Block.........................................................8-6
Figure 8.3 CON4 Remote Input Signal Connector ..................................................................8-8
Figure 8.4 CON4 Remote Output Signal Connector .............................................................8-10
Figure 9.1 Tuning Procedures.................................................................................................9-2
Figure 9.2 LCD Message in Rated Speed Setting Mode.........................................................9-5
Figure 13.1 External Appearance of the STP Pump [without Anti-Corrosion Treatment]
(Example: STP-301).............................................................................................13-2
Figure 13.2 External Appearance of the STP Pump [Chemical Specific Type C]
(Example: STP-301C) ..........................................................................................13-3
Figure 13.3 Label Affixing Position for the STP Pump ............................................................13-4
Figure 13.4 External Appearance of the the STP Control Unit ................................................13-7
Figure 13.5 Label Affixing Positions for the STP Control Unit .................................................13-8