Installation, Operation and Maintenance Manual
MAN-02-04-97-0713-EN Rev. 1
October 2019
7
Storage and Pre-Installation
Section 2: Storage and Pre-Installation
Figure 6
2.3 Checks to be Performed Before Installation
• Make sure that the valve to be motorized is appropriate for coupling to
the actuator.
• The electrical supply cables must be suitable for the power rating
(refer to the test certicate that comes with the actuator).
• Gather the right tools for assembly and for setting the actuator controls.
If the actuator has been stored for a long period of time prior to its installation, make sure to:
• Check the condition of the O-ring seals.
• Check the installation of the plugs or conduit glands on the conduit entries.
• Check if the enclosure covers or the actuator body are cracked or broken.
• Check the oil level in the actuator and top up if necessary.
• Put the batteries back into place (see Section 11.3, Maintenance - Lithium
battery change).