EasyManuals Logo

Emerson Bettis XTE3000 User Manual

Emerson Bettis XTE3000
175 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
Installation, Operation and Maintenance Manual
MAN-02-04-97-0713-EN Rev. 1
October 2019
7
Storage and Pre-Installation
Section 2: Storage and Pre-Installation
Figure 6
2.3 Checks to be Performed Before Installation
Make sure that the valve to be motorized is appropriate for coupling to
the actuator.
The electrical supply cables must be suitable for the power rating
(refer to the test certicate that comes with the actuator).
Gather the right tools for assembly and for setting the actuator controls.
If the actuator has been stored for a long period of time prior to its installation, make sure to:
Check the condition of the O-ring seals.
Check the installation of the plugs or conduit glands on the conduit entries.
Check if the enclosure covers or the actuator body are cracked or broken.
Check the oil level in the actuator and top up if necessary.
Put the batteries back into place (see Section 11.3, Maintenance - Lithium
battery change).

Table of Contents

Other manuals for Emerson Bettis XTE3000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Emerson Bettis XTE3000 and is the answer not in the manual?

Emerson Bettis XTE3000 Specifications

General IconGeneral
BrandEmerson
ModelBettis XTE3000
CategoryController
LanguageEnglish

Related product manuals