
Do you have a question about the EMS SmartCell and is the answer not in the manual?
Covers installation codes, device selection, ESD, and environmental conditions.
Includes signal level checks, operational tests, and ongoing system maintenance.
Diagram and instructions for wiring inputs, outputs, and resistors for addressable systems.
Diagram and instructions for connecting sounder and zone circuits for conventional systems.
Details on connecting the 230 VAC mains input for WZMs.
Guidance on connecting dual 24 VDC power inputs and fault inputs.
Instructions for connecting the 6V 4Ah backup battery, observing polarity.
Instructions on switching on the power supply or using the backup battery to power the WZM.
Step-by-step guide to entering the engineer PIN and accessing advanced menus.
Steps to add new devices, including inserting batteries and confirming identity.
Steps to access and modify device attributes like detection, sensitivity, and sound volume.
Guidance on testing smoke detectors, heat detectors, call points, sounders, and I/O devices.