EasyManua.ls Logo

ESAB Cutmaster 40 - System Installation Procedures; Unpacking the Equipment; Lifting and Moving Options

ESAB Cutmaster 40
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CUTMASTER 40
0-5570 INSTALLATION
25
SECTION 3 SYSTEM: INSTALLATION
3.01 Unpacking
1. Use the packing lists to identify and account for each item.
2. Inspect each item for possible shipping damage. If damage is evident, contact your distributor
and / or shipping company before proceeding with the installation.
3. Record Power Supply and Torch model and serial numbers, purchase date and vendor name,
in the information block at the front of this manual.
3.02 Lifting Options
The Power Supply includes handles for hand lifting only. Be sure unit is lifted and transported safely
and securely.
WARNING
Do not touch live electrical parts.
Disconnect input power cord before moving unit.
FALLING EQUIPMENT can cause serious personal injury and can damage equipment.
HANDLES are not for mechanical lifting.
Only persons of adequate physical strength should lift the unit.
Lift unit by the handles, using two hands. Do not use straps for lifting.
Use optional cart or similar device of adequate capacity to move unit.

Table of Contents

Related product manuals