EasyManua.ls Logo

ESAB Cutmaster 40 - System Service and Maintenance; General Maintenance Schedule

ESAB Cutmaster 40
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CUTMASTER 40
0-5570 SERVICE
39
SECTION 5 SYSTEM: SERVICE
5.01 General Maintenance
Warning!
Disconnect input power before maintaining.
Each Use
Visual check of
torch tip and electrode
Weekly
Visually inspect the torch body,
consumables and Quick Connect
Visually inspect the
cables and leads.
Replace as needed
3 Months
Clean
exterior
of power supply
Replace all
broken parts
Maintain more often
if used under severe
conditions
Art# A-14037
5.02 Maintenance Schedule
NOTE!
The actual frequency of maintenance may need to be adjusted according to the operating environment.
Daily Operational Checks or Every Six Cutting Hours:
1. Check torch consumable parts, replace if damaged or worn.
2. Check plasma and secondary supply and pressure/ow.
Weekly or Every 30 Cutting Hours:
1. Check fan for proper operation and adequate air ow.
2. Inspect torch for any cracks or exposed wires, replace if necessary.
3. Inspect input power cable for damage or exposed wires, replace if necessary.

Table of Contents

Related product manuals