EasyManua.ls Logo

ESAB PT-36 - Torch Body Maintenance

ESAB PT-36
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
163
ELECTRIC SHOCK CAN KILL!
BEFORE PERFORMING TORCH MAINTENANCE:
Turn power switch of the power source console to the OFF position •
Disconnect primary input power. •
WARNING
5.6 Torch Body
Inspect O-rings daily and replace if damaged or worn. •
Apply a thin coat of silicone grease to O-rings before assembling torch. This facilitates easy future as-•
sembly and disassembly for service.
O-ring (1.61 I.D. X .070 BUNA-70A). •
O-Ring locations
Keep electrical contract ring contact points free of grease and dirt. •
Inspect ring when changing nozzle. •
Clean with cotton swab dipped in isopropyl alcohol. •
Contact Ring Points
Contact Ring
Contact Ring Points
Contact Ring Screw
SECTION 5 MAINTENANCE

Other manuals for ESAB PT-36

Related product manuals