EasyManua.ls Logo

ETC Halcyon Gold - Install the Fixture

ETC Halcyon Gold
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the Fixture 10
Install the Fixture
Overhead rigging must be performed by qualified personnel. Follow all local and national
codes and recommended practices.
WARNING:
The installation location must support a minimum point load of 10 times
the weight of the fixture. Fixture weight is 28.1kg (62lb).
The installation must always be secured with a secondary safety
attachment. An appropriate safety cable is supplied.
Safety cable attachment must be rated by a safety factor of 10.
A supportive and stable surface must be used when fixtures are placed
on their feet.
Never stand directly below the installed fixture when mounting,
removing, or servicing the fixture.
All safety and technical aspects of fixture installation must be approved
by qualified personnel before operation.
The installation must be regularly inspected by qualified personnel.
AVERTISSEMENT :
L'emplacement d'installation doit supporter une charge concente
minimale de 10 fois le poids de l'appareil. Le poids du projecteur est de
28.1kg (62lb).
L'installation doit toujours être sécurisée par une fixation de sécurité
auxiliaire. Un câble de sécurité approprié est fourni.
La fixation du câble de sécurité doit être classée avec un facteur de
sécurité de 10.
Une surface d'appui stable doit être utilisée quand les projecteurs sont
placés sur pieds.
Ne vous placez jamais directement sous le projecteur lors du montage,
du démontage ou de son entretien.
Tous les aspects techniques et de sécurité de l'installation du projecteur
doivent être approuvés par un personnel qualifié avant qu'il ne soit
utilisé.
L'installation doit être régulièrement inspectée par du personnel
qualifié.

Table of Contents

Related product manuals