EVER UPS SINLINE RT / RT XL series instruction manual
Pomoc Techniczna, tel.: +48 61 6500 400
MEASUREMENTS submenu
The MEASUREMENTS submenu is divided into five screens with data for the mains
input parameters, UPS unit's output parameters and UPS unit's internal blocks
parameters. Navigation within this menu is similar to the way shown earlier.
MEASUREMENTS 1/5
Description: Temperature and voltage measurement
– temperature in the UPS unit's inverter block in [°C]
– temperature of the UPS unit's battery in [°C]
Description: Current and output power measurement
– value of current consumed by receivers connected to the UPS
– value of active power consumed by receivers connected to the
UPS
– value of apparent power consumed by receivers connected to
the UPS