EasyManua.ls Logo

Eversys Enigma Classic E'2ct - Page 12

Eversys Enigma Classic E'2ct
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1 For Your Safety
12/ 132 Enigma User Manual | © Eversys S.A.
It is imperative to use only the products, accessories, spare parts and software specified in
this manual.
The powder chute, the bean hoppers, and the Eversys cleaning ball dispenser may only be
filled with materials for the use intended.
Except for cups, do not place anything on top or above the Enigma.
The machine is not suitable for installation in an area where a water jet or water spray might
be used.
The machine must not be located on a surface that is sprayed or cleaned with a water hose,
steam jets, steam cleaner, or similar equipment.
The machine must be placed and levelled on a horizontal, water-resistant, heatproof, and
sturdy base capable of bearing its weight,
see “2.3 Technical data” on page 23.
For operating, service and safety reasons the machine should be installed with a clearance of
not less than 50 mm at the back and sides from the building or non-approved equipment. A
minimum working space of 650 mm in front the coffee machine and overhead clearance of at
least 250 mm above the bean hoppers are recommended. A clear height of 850 mm from the
top of the installation surface should be ensured. The height of the installation surface above
the floor is at least 800 mm. If the coffee machine connections are to be run downwards
through the counter, please make space for the lines, which can reduce the usable space
below the coffee machine.
The machine is only to be installed in locations where its use and maintenance is restricted to
trained personnel. Please refer to
“10.3.2 «Persons»” on page 119.
Only connect the machine to the mains in accordance with the information on the rating
plate
“2.3.16 Rating plate” on page 39.
Adjustment of the frequency is automatic. No action is required.
The power cord must be in accordance with local regulations. Voltage/current specifications
are as listed in the table
“ Electrical data and power overview” on page 23.
To connect the machine to the water mains, use the original supplied hoses only.
Any necessary on-site preparatory work for electricity, water and drainage connections at the
customer‘s premises is to be arranged by the machine owner / manager. The work must be carried
out by authorised installation technicians in compliance with general, country-specific and local
regulations. Eversys service organisations may only connect the coffee machine to existing prepared
connection points. Eversys appointed service organisations are neither authorised, nor responsible for
carrying out any on-site installation work prior to connection.

Table of Contents

Related product manuals