EasyManua.ls Logo

Extreme Networks ExtremeSwitching SLX 9540 - Page 64

Extreme Networks ExtremeSwitching SLX 9540
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NOTE
Always use the pull tab to insert or remove transceivers as they might be hot.
1. Perform one of the following steps, depending on your transceiver type.
If the transceiver uses a pull tab, use the pull tab to help push the transceiver into the port until it is rmly seated and the
latching mechanism clicks.
FIGURE 34 Installing an SFP+ transceiver with pull tab into the interface module port
1. Pull tab 2. Transceiver
If the transceiver uses a bail latch mechanism (10 GbE transceivers only), ensure that the bail (wire handle) is in the
unlocked position, grasp the transceiver, and push it into the port until rmly seated. Close the bail to latch the transceiver in
the slot.
Installing an SFP+ transceiver
ExtremeSwitching SLX 9540 Hardware Installation Guide
64 9036360-00 Rev AB

Table of Contents

Related product manuals