3. Installation
3−11
Festo P.BE−CPV−EN en 0503g
3.3.2 Connecting the supply and work lines
Please note
· Unused connections. Seal all connections not required
for functioning with blind plugs (see Appendix B).
· Unused connections. Seal work connections 2 and 4 with
blind plugs.
· Valve sub−base with Ident. code C (two 3/2−way valves
closed in basic position):
With the 5/3G valve extension you can implement the
function in mid−position blocked" with this CPV10/14
valve sub−base. This valve extension is mounted on the
connection side of the above−mentioned valve sub−base
(see 2.3 Fitting the valve extensions").
· Connect the work lines as follows, depending on the tool
you are using:
screw connector with hexagon socket head: Any
sequence is possible.
screw connector with external hexagon socket head:
Connection must be made from left to right (space for
wrench).