EasyManua.ls Logo

Festo CPX-CEC - Page 56

Festo CPX-CEC
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Commissioning
3−4
Festo P.BE−CPX−CEC−EN en 1004a
4. In the "Object Organizer", change to "Resources".
5. Open the "PLC Configuration".
6. Select the Root node, if applicable.
7. Open the "Network configuration" tab.
8. Carry out the "Search network" function.
9. Select the desired CoDeSys controller.
10. Carry out the "Set as active PLC" function.
11. Save the project.
You can now log in to the controller, if necessary.
Fig.3/1: Network configuration using the example of the CPX−CEC−C1

Related product manuals