Pre-Commissioning Checklist
For DENCO
®
Systems
IMPORTANT: Failure to complete this form IN FULL before Commissioning Engineer’s arrival may result in commissioning being
aborted. Your signature confirms compliance with this checklist’s requirements and accepts any subsequently incurred charges,
where the requirements has not been adhered to. Please complete and return this form to your FläktGroup contact before the
commissioning date.
Page 2 of 3
Based on DQA880
Checklist Item Note
Y / N
N/A
Comments
10
For equipment with water circuits
Has all the water pipework been:
a. Installed?
b. Fitted with auto air vents?
c. Fitted with Strainers?
d. Fitted with dosing pots?
e. Tested?
f. Filled with water?
g. Been vented?
11
For equipment with water circuits
If the circuit is to use a glycol mixture: has this been
completed and can accurate concentration readings be
provided?
12 Is the drainage pipework connected and tested?
13
For OfficeCool Installations
a. Has the interconnecting communication cables been
installed between each LECU?
b. Can a drawing be provide showing this network and
number / ordering system?
14
For equipment with condensate pumps
Are condensate pumps:
a. Installed (electrical wiring & pipework)?
b. Without internal packaging?
c. Tested?
15 Has mains power supply been:
a. Installed?
b. Connected at the isolators?
c. Checked for correct phase rotation?
d. Checked for electrical power being available at the
isolators?
16
Has any interconnecting electrical wiring been installed and
connected as per the specific wiring diagram(s)?
17 Have fire shutdown connections been installed and verified
as operating correctly?
18
Have external stop-start connections (if required) been
installed and tested?
19
For equipment requiring network connections
Have interconnection cables for networking (DENCONET):
a. Been placed / installed using the correct wire
specification (see Operation Manual Chapter 7)?
b. Left “open” for our final connection?