EasyManua.ls Logo

Fluke 8808A - Diode and Continuity Testing

Fluke 8808A
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the Meter from the Front Panel
Selecting a Measurement Function 3
3-15
Diode / Continuity Testing
Press G to toggle between the continuity and diode test functions for the primary
display. (These functions cannot be selected for the secondary display.)
To perform a continuity test:
1. If required, press G to select the continuity test function.
2. Connect the test leads between the Meter and the circuit under test as shown in
Figure 3-10.
The beeper emits a continuous tone if the input is below 20 Ω.
To perform a diode or transistor junction test:
1. If required, press G to select the diode test function.
2. Connect the test leads between the Meter and the diode or transistor junction as
shown in Figure 3-11.
The forward voltage of the semiconductor junction (or junctions) is measured.
Readings are displayed in the 2 V range at the fast measurement rate. The Meter
displays 0L if the input is above +2 V.
HI
LO
1000V
750V
2W/4W
MAX
INPUT SENSE
HI
LO
4W
10 A
mA
200 mA
MAX
10 A
MAX
1000V CAT I
600 V CAT II
500 V pk
V
1V
300V
eue15.eps
Figure 3-10. Continuity Test
Shop for Fluke products online at:
1.877.766.5412
www.MyFlukeStore.ca

Table of Contents

Other manuals for Fluke 8808A

Related product manuals