REPETITIVE TESTING AND
TROUBLESHOOTING SUMMARY
1.5.
After your
91004/9105A
system has been through power-up,
self-tests, configuration, and calibration, it is ready for testing
and troubleshooting. The processes are summarized below, and
are explained in detail in later sections of this manual.
0
Functional Testing (EXEC key)
-
Section 5.
l
Automated Troubleshooting (GFI key)
-
Section 6.
0
RUN UUT Testing (RUN UUT key)
-
Section 7.
To use the
91OOA/9105A
to test or troubleshoot:
1.
Connect the pod to the UUT, and then power-up the
UUT.
2.
Test the UUT using the RUN UUT key or the EXEC
key or a combination of the two.
3.
If the UUT fails a test, troubleshoot it using the GFI
key.
l-7